Modelling & Scenario.
Run scenarios in parallel, promote one to baseline.
How many scenarios can run in parallel?
Practically unbounded. Run base, downside, optimistic, stretch, and as many what-ifs as the business needs. They share the same data structure as the live plan, so consolidation and comparison are automatic.
Can I model FX and commodity volatility natively?
Yes. FX rates and commodity prices are first-class drivers. Run scenarios with different rate assumptions in parallel and adopt the version your board signs off — no manual rate refreshing.
How does promoting a scenario to baseline work?
One action. The adopted scenario becomes the live operating plan; the prior baseline and all rejected scenarios are preserved in the audit trail. No copy-paste, no model fork, no version drift.
Will the audit trail show all the rejected scenarios too?
Yes. Every scenario version is timestamped, attributed, and preserved indefinitely. Auditors can trace exactly what was considered, what was adopted, and what was rejected at every decision point.